The stockpile of slabs was
down considerably
by September


Timbers were being used for
interior ribs


Many of the clamps on the
lower reaches of the
hull were gone


The stern


The sides of the hull had
risen only slightly since
our last visit


The stockpile of scrap
was growing


More ribs had been added and
braces for the ribs were
in place now


The small ribs were new


Cross braces had also
been added


Beneath the starboard side
of the boom


Some of the bolts to be used
to attach ribs to the planks